Building thousands of roads to reduce CO2?

Note the width of the road compared to the road grader. This new wind turbine access road follows the treeline toward the horizon. These pictures were taken in February, 2014 from the existing municipal road (dark horizontal strip in the foreground).  The bottom picture has a sign indicating that 2 wind turbines will be accessed from the new road. New roads are being built for the almost 7,000 large wind turbines planned for Ontario, Canada. For a detailed list, open the spreadsheet on the home page.

roadway and grader

size of grader compared to roadwayturbine sign number and roadway

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: