St. Columban project up for 30 day comment

Fifteen 2.3 MW turbines

Ontario Wind Resistance

Submit Comment for St. Columban Wind Project Due December 21

Proponent: St. Columban Energy LP– 222 3rd Avenue, Calgary Alberta, Canada T2P 0B4
Instrument Type: Approval for a renewable energy project – EPA s.47.3(1)
Ministry Reference Number: 6602-8V9P97
Ministry: Ministry of the Environment
Date Proposal loaded to the Registry: November 21, 2012
Comment Period: 30 days: submissions may be made between November 21, 2012 and December 21, 2012.
Description of Instrument:
This posting is for a proposed Renewable Energy Approval (REA) by St. Columban Energy LP (a wholly owned subsidiary of Veresen Inc.) for the St. Columban Wind Project, proposed to be located in the Municipality of Huron East, the Municipality of Morris-Turnberry and the Township of Howick, Huron County. This is a Class 4 Wind Facility with a total expected generation capacity of 33 megawatts (MW), and will consist of 15 turbines.

The proposed facility is considered…

View original post 209 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: