Dufferin County, Ontario: 3 REpower 2.05 MW wind turbine generators, step-up transformers located adjacent to each turbine, electrical power line system, switching station, meteorological tower and turbine access roads etc. etc.

Ontario Wind Resistance

Environmental Registry (submit comments by August 16)
This posting is for a proposed Renewable Energy Approval by wpd Whittington Wind Incorporated, proposed to be located in the Township of Amaranth. This is a Class 4 Wind Facility with a total expected generation capacity of 6.15 megawatts (MW) and will operate 24 hours per day, 365 days per year.

The proposed facility is considered to be a Class 4 Wind Facility under Ontario Regulation 359/09 (O. Reg.359/09) Renewable Energy Approvals under Part V.0.1 of the Environmental Protection Act. Applications for Renewable Energy Approvals are required to be submitted in accordance with O.Reg.359/09 for consideration for approval.

View original post 142 more words

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: